Taking Over Software from a Departing Contractor: A Handover Checklist

The best time to plan a software handover is before anyone leaves. The second-best time is the moment you learn they’re leaving. Either way, a structured handover saves weeks of reverse-engineering later.

Use this software handover checklist whenever a developer, contractor, or agency that built or maintains your software is stepping away.

1. Accounts and access

Make sure every account is owned by the company, not the individual.

For each: transfer ownership to a company account, store credentials in a shared password manager, and confirm at least two people can log in.

2. Code

3. Infrastructure and deployment

4. Data and backups

5. Documentation and knowledge

Ask the departing person to write, or record a walkthrough of:

A recorded screen-share walkthrough is often the most efficient way to capture this.

6. After they’re gone

If it’s already too late

If the person is already gone and the handover didn’t happen, don’t panic. Start with access recovery: domain, hosting, and code repository first, since those are hardest to replace. Then work through the list as far as you can. Most systems can be recovered and documented, but it takes focused effort.

Taking over orphaned systems is exactly what we do with managed software services. If you’re facing a handover right now, get in touch.


Tell us what you're running.

Two quick steps. I'll read it personally and reply with an honest read on your situation and whether our team can help, usually within one business day.

  • I lead every engagement personally
  • No sales sequences, and your details are only used to reply

Prefer email? [email protected]

Step 1 of 2

Which sounds most like you?
What's prompting this? Pick any that apply
How many business-critical custom systems?
Timeline
Where should I reply?